Million Housing Units Program

539 boreholes totalling 5,554 m across El Obour, Badr City and El Minya, with field and lab testing plus foundation recommendations delivered in six weeks.

HousingAt scale

El Obour, Badr City & El Minya

Overview

The Million Housing Units programme was a test of throughput rather than complexity. Horema completed 539 boreholes totalling 5,554 metres across three separated sites and delivered field results, laboratory testing and foundation recommendations inside six weeks.

Delivering that volume meant running multiple rig crews concurrently in El Obour, Badr City and El Minya, with a logistics chain that moved samples into the laboratories daily and a reporting team producing standardised outputs per housing cluster.

The campaign remains a reference point for how quickly a national-scale investigation can be executed without relaxing ASTM and BS testing discipline.

Million Housing Units Program site imagery
El Obour, Badr City & El Minya

Services applied

Capabilities on this project

Soil Investigation

Borehole drilling, sampling, in-situ testing (SPT, permeability, vane shear), geotechnical logging and groundwater table monitoring.

Field Testing

Plate load tests, CBR, sand cone, test pits and density/moisture assessments on roads and foundations.

Laboratory Testing

Soil, rock, aggregate, water and chemical testing aligned with ASTM and BS standards.

Geotechnical Reporting

Factual and interpretive reports including foundation recommendations and engineering assessments.