Arab Contractors · Orascom Construction

Railways & Mass Transit

High-Speed Railway (Monorail) 6th of October sector, the Electric Express Train, and the Alexandria Regional Metro from Abu Qir to Misr Station.

Infrastructure

Greater Cairo, 6th of October & Alexandria

Overview

Transit alignments cross dozens of geological settings in a single corridor, and each pier, station box and portal needs its own founding solution. Horema delivered linear investigation campaigns for the monorail, the Electric Express Train and the Alexandria Regional Metro, sequencing rigs to keep pace with fast-moving design programmes.

Urban drilling brought its own constraints: restricted access, live traffic, buried services and night-work windows. Our crews planned around them while maintaining sampling and logging discipline, and installed monitoring points where groundwater control governed station excavation design.

Reports were structured alignment-by-alignment so designers could compare founding options pier to pier, with settlement and bearing parameters presented for both shallow and piled solutions.

Railways & Mass Transit site imagery
Greater Cairo, 6th of October & Alexandria

Services applied

Capabilities on this project

Soil Investigation

Borehole drilling, sampling, in-situ testing (SPT, permeability, vane shear), geotechnical logging and groundwater table monitoring.

Field Testing

Plate load tests, CBR, sand cone, test pits and density/moisture assessments on roads and foundations.

Laboratory Testing

Soil, rock, aggregate, water and chemical testing aligned with ASTM and BS standards.

Geotechnical Reporting

Factual and interpretive reports including foundation recommendations and engineering assessments.

All services →